July 2026
Iran Mall deep excavation featured in geotechnical review
A look back at the 45 m stabilization scheme — multi-strand anchorage, soil nailing and cast-in-place piles delivered in dense urban conditions.
A look back at the 45 m stabilization scheme — multi-strand anchorage, soil nailing and cast-in-place piles delivered in dense urban conditions.